求翻譯:for example, dam height and spillway capacity might be appropriately designed based on the estimated flood hydrographs with the 1,000 year return prriod, so that the 1,000 year flood should be safely discharged through the spillway without overtopping the dam crest是什么意思?![]() ![]() for example, dam height and spillway capacity might be appropriately designed based on the estimated flood hydrographs with the 1,000 year return prriod, so that the 1,000 year flood should be safely discharged through the spillway without overtopping the dam crest
問題補充: |
|
2013-05-23 12:21:38
例如,可能是適當的設計壩高和泄洪能力的基礎上估計洪水水位與1000年的回報prriod,使1000年一遇洪水安全通過溢洪道排出不漫壩頂
|
|
2013-05-23 12:23:18
舉例來說,水壩高度能力和溢洪道可能適當的設計的估計水災hydrographs prriod返回的一千年,以便在千年洪水應安全地履行通過溢流沒有安全措施的堤壩通路
|
|
2013-05-23 12:24:58
例如,水壩高度和溢洪道容量也許適當地被設計根據估計的洪水水位圖與1,000年回歸prriod,因此應該通過溢洪道安全地釋放1,000年洪水,無需超過水壩冠
|
|
2013-05-23 12:26:38
例如,大壩高度和泄洪能力可能適當設計基于估計的洪水流量過程圖與 1,000 年返回 prriod,使 1,000 年洪水應通過溢洪道不漫壩壩頂的情況下安全地排
|
|
2013-05-23 12:28:18
例如,可能是適當的設計壩高和泄洪能力的基礎上估計洪水水位與1000年的回報prriod,使1000年一遇洪水安全通過溢洪道排出不漫壩頂
|