|
關注:1
2013-05-23 12:21
求翻譯:Not less than 2 weeks before the start of concrete work, the Contractor shall submit to the Project Manager for his approval a statement of proposed mix proportions for the various grades required in the project. (Note: the grade is the characteristic strength or the cube strength below which not more than 5 % of the 是什么意思?![]() ![]() Not less than 2 weeks before the start of concrete work, the Contractor shall submit to the Project Manager for his approval a statement of proposed mix proportions for the various grades required in the project. (Note: the grade is the characteristic strength or the cube strength below which not more than 5 % of the
問題補充: |
|
2013-05-23 12:21:38
不小于2周的具體工作開始前,承包人應當提交其批準的項目經理的建議配比為項目中所需的各種檔次的聲明。 (注:檔次特征強度或以下的不超過5%的結果可以預期下降時,在28天測試)的立方體強度。等級要求的,應當按照批準的設計和圖紙。
|
|
2013-05-23 12:23:18
不少于2周前開始的具體工作,承包者應向秘書長提交的項目經理批準了一項聲明,他建議混合比例的不同等級的項目中所需。 (注:該職系的特點是強度或強度低于該多維數據集不超過5%的結果將可能是在測試時可能會下降28天)。 每個年級的應在需要時,經批準的設計及圖紙。
|
|
2013-05-23 12:24:58
不少于2個星期,在具體工作開始,承包商將遞交給項目負責人為他的認同提出的混合比
|
|
2013-05-23 12:26:38
不少于 2 周前開始的具體工作,承建商應提交給項目經理批準擬議的混合比例的項目中所需的各種檔次的語句。(注: 等級為特征的強度或下面哪個不超過 5%的結果可能預期下降時 28 天的測試,測試的多維數據集強度)。所需的職系須按核準的設計和繪圖。
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區