求翻譯:在孔口管上接好注漿系統和壓力表,先測量鉆孔靜水壓,然后用水桶和秒表測量涌水量。是什么意思?![]() ![]() 在孔口管上接好注漿系統和壓力表,先測量鉆孔靜水壓,然后用水桶和秒表測量涌水量。
問題補充: |
|
2013-05-23 12:21:38
The orifice tube on the grouting system and pressure gauge, measurement drilling hydrostatic first, and then use the bucket and stopwatch to measure the inflow.
|
|
2013-05-23 12:23:18
In the hole on the tube to good Note jelly system and a pressure gauge, drill holes measure hydrostatic pressure, and then use a stopwatch to measure water bucket and surge of water.
|
|
2013-05-23 12:24:58
Meets the note thick liquid system and the pressure gauge on the manhole tube, surveys the drill hole static hydraulic pressure first, then wells up the water volume with the bucket and the stopwatch survey.
|
|
2013-05-23 12:26:38
In a orifice tube Grouting system and pressure gauges, bored hydrostatic measurement first, and then measuring the water with buckets and a stopwatch.
|
|