關(guān)注:1
2013-05-23 12:21
求翻譯:鉆機到位,根據(jù)設(shè)計要求找正對中并固定。接風(fēng)試運轉(zhuǎn)。檢查各部位轉(zhuǎn)正常后,接上鉆具開始鉆進。是什么意思?![]() ![]() 鉆機到位,根據(jù)設(shè)計要求找正對中并固定。接風(fēng)試運轉(zhuǎn)。檢查各部位轉(zhuǎn)正常后,接上鉆具開始鉆進。
問題補充: |
|
2013-05-23 12:21:38
The rig in place, alignment and fixed in accordance with design requirements. Jie Feng commissioning. Check each part to turn normal, connected to the drill to start drilling.
|
|
2013-05-23 12:23:18
Drill rigs in place, according to the design requirements are found in the. A wind test run. Inspect the area after the normal drilling, connected to start drilling.
|
|
2013-05-23 12:24:58
The drilling machine arriving, adjusts according to the design request to and fixed.Reception test run.After inspects various spots to transfer normally, joins the drilling tool to start to sneak in.
|
|
2013-05-23 12:26:38
Drilling rig in place, according to the design requirements is to be found and fixed. Contact anemometer test run. Check the parts go when connected to the drill started drilling.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|