求翻譯:本文采用了鉆孔灌注樁加錨桿以及土釘支護的基坑支護的設計方法。是什么意思?![]() ![]() 本文采用了鉆孔灌注樁加錨桿以及土釘支護的基坑支護的設計方法。
問題補充: |
|
2013-05-23 12:21:38
Bored piles and anchor and soil nailing design of excavation support.
|
|
2013-05-23 12:23:18
This is a bored piles the anchor bar, as well as the support of soil nails pit design methodology for the support.
|
|
2013-05-23 12:24:58
This article used the drill hole filling pile to add the anchor rod as well as the earth nail supports and protections hole excavated for building foundation supports and protections design method.
|
|
2013-05-23 12:26:38
This article uses a bored pile and anchor and soil nailing Foundation pit support design methods.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|