|
關注:1
2013-05-23 12:21
求翻譯:針對脈沖式發電機工作時一直處于變轉速、變損耗的非穩定運行的特點,利用網絡分析法和CFD分析法對發電機通風冷卻系統進行瞬態分析,論證了195MW脈沖發電機采用全空氣冷卻系統的可行性。是什么意思?![]() ![]() 針對脈沖式發電機工作時一直處于變轉速、變損耗的非穩定運行的特點,利用網絡分析法和CFD分析法對發電機通風冷卻系統進行瞬態分析,論證了195MW脈沖發電機采用全空氣冷卻系統的可行性。
問題補充: |
|
2013-05-23 12:21:38
For the pulse generator has been in a variable speed, variable loss of non-stable operation characteristics, the use of network analysis and cfd analysis on generator ventilation cooling system transient analysis, 195mw pulse generator using air cooling the feasibility of the system.
|
|
2013-05-23 12:23:18
For pulse-generator work has been in a constant speed, change the loss of non-steady run, taking advantage of the network analysis, and analysis of the alternator CFD ventilation cooling system for transient analysis, and demonstrates a MW pulse generator 195 with the air cooling system.
|
|
2013-05-23 12:24:58
Works in view of the pulse type generator when is in continuously changes the rotational speed, changes the loss to decide the movement unstable the characteristic, carries on the transient state analysis using the network analytic method and the CFD analytic method to the generator fan cooling syst
|
|
2013-05-23 12:26:38
While working for pulse generator has been in a variable-speed, variable loss of unsteady characteristics of running, use network analysis and CFD analysis on ventilation cooling system of generator transient analysis, justify the 195MW feasibility of pulse generator using air cooling system.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區