|
關注:1
2013-05-23 12:21
求翻譯:水塔上下水管道、照明燈具等的施工均按常規(guī)施工方法施工。是什么意思?![]() ![]() 水塔上下水管道、照明燈具等的施工均按常規(guī)施工方法施工。
問題補充: |
|
2013-05-23 12:21:38
Water tower down the water pipes, lighting fixtures and other construction works according to conventional construction methods.
|
|
2013-05-23 12:23:18
water and sewage pipes, lighting towers, such as construction of the conventional method of construction works.
|
|
2013-05-23 12:24:58
About the water tank the water conduct, the illumination lamps and lanterns and so on the construction presses the convention job practice construction.
|
|
2013-05-23 12:26:38
正在翻譯,請等待...
|
|
2013-05-23 12:28:18
The construction of water-supply line and sewer pipeline of the water tower, lighting the lamps and lanterns,etc. constructs according to the construction method of the routine.
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)