Dry period of power shortage will reach 127MW. So Florida area local power grid interconnection project construction will become very urgent.
|
|
2013-05-23 12:23:18
withered period will reach 127 MW electricity shortfall. Therefore, state and local governments as the regional power grid electricity construction works on the Internet 10 hours remain unchanged in the urgent.
|
|
2013-05-23 12:24:58
The dry time electric power gap will achieve 127MW.Therefore reaches the extremely urgency which the state place electric power region electrical network the networking engineering construction changes.
|
|
2013-05-23 12:26:38
Blight phase electricity shortfall will reach 127MW. So Florida local power in regional power grid interconnection project construction becomes very urgent.
|
|