|
關注:1
2013-05-23 12:21
求翻譯:甲方未辦理有關手續,不得擅自要求乙方變動建筑主體、承重結構或拆改燃氣管道、設施是什么意思?![]() ![]() 甲方未辦理有關手續,不得擅自要求乙方變動建筑主體、承重結構或拆改燃氣管道、設施
問題補充: |
|
2013-05-23 12:21:38
Party did not complete the formalities are not allowed to request Party B to change the construction of the main, load-bearing structure or Chaigai gas pipeline facilities
|
|
2013-05-23 12:23:18
Party A shall, in the absence of authorization, without going through the formalities required architecture of the main Party B changes, load-bearing structures or clearance was changed gas pipelines and facilities
|
|
2013-05-23 12:24:58
The party of the first part has not gone through the related formalities, does not have to request the second party to change the construction main body, the load-bearing member arbitrarily or opens changes the fuel gas pipeline, the facility
|
|
2013-05-23 12:26:38
Without going through the formalities of party a, will be allowed to request party b main changes, load-bearing structure, or demolition of gas pipelines, facilities
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區