求翻譯: 天冠沼氣電廠接入系統方案一次部分投資估算見下表,表中所列投資為典型估算,僅供比較方案使用,實際投資以工程設計、概預算和設備招標為準。本節估算不含天冠沼氣電廠內部電氣投資。是什么意思?![]() ![]() 天冠沼氣電廠接入系統方案一次部分投資估算見下表,表中所列投資為典型估算,僅供比較方案使用,實際投資以工程設計、概預算和設備招標為準。本節估算不含天冠沼氣電廠內部電氣投資。
問題補充: |
|
2013-05-23 12:21:38
The Tianguan biogas power plant access system program once part of the investment to estimate the table below, the investments listed in the table as a typical estimate, only the ICP, the actual investment in engineering design, none of the budget and equipment tender shall prevail. This section est
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
Tianguan biogas power plant a part of investment estimation scheme of connecting see table below, investment for the typical estimate listed in the table, only for use by the ICP, the actual investment in engineering design, budget and equipment tenders shall prevail. Estimates in this section does
|
|