求翻譯: 沼氣電廠一期建設5臺3MW機組,其中2臺接入廠內10kV母線I段,3臺接入廠內10kV母線II段。運行時,II段母線上一臺機組作為備用,其余4臺投入運行。二期建成后,每4臺機組接入一段10kV母線。運行時,II段母線上一臺機組作為備用,其余7臺投入運行。是什么意思?![]() ![]() 沼氣電廠一期建設5臺3MW機組,其中2臺接入廠內10kV母線I段,3臺接入廠內10kV母線II段。運行時,II段母線上一臺機組作為備用,其余4臺投入運行。二期建成后,每4臺機組接入一段10kV母線。運行時,II段母線上一臺機組作為備用,其余7臺投入運行。
問題補充: |
|
2013-05-23 12:21:38
A biogas power plant construction five 3mw unit, access factory 10kv bus i access factory 10kv bus ii. Runtime, ii segment bus unit as a backup, the remaining four units in operation. After the completion of the two, every four units access section of 10kv bus. Runtime, ii segment bus unit as a back
|
|
2013-05-23 12:23:18
A biogas plant construction MW units 5, 3, 2 to 10 in the factory I kV bus, 3 desktop access plant kV bus II in paragraph 10. Run-time, on a bus II paragraph units as an alternative, the remaining 4 units in operation. Phase 2 is completed, each 4 units Access A 10 kV bus. Run-time, on a bus II para
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
Biogas power plant construction with a 5 sets of units, of which paragraph 2 sets of 10kV in the access factory bus I, 3 set access factory 10kV bus II. At run time, paragraphs II a unit on the bus as an alternative, the remaining 4 and put into operation. Following completion of the second phase, e
|
|
2013-05-23 12:28:18
A methane power plant issue constructs 5 3MW units, in 2 turning on factory 10kV generatrix I section, in 3 turning on factories 10kV generatrix II section.When movement, in II section of generatrixes a unit takes spare, other 4 investment movement.After two issues complete, every 4 units turn on a
|