|
關注:1
2013-05-23 12:21
求翻譯:TCM J列、G列、GH列間1.2米矮墻澆筑壓頂梁、墻面抹灰。是什么意思?![]() ![]() TCM J列、G列、GH列間1.2米矮墻澆筑壓頂梁、墻面抹灰。
問題補充: |
|
2013-05-23 12:21:38
the tcm j column, g column, 1.2 m low wall pouring gh column top pressure beams, wall plastering.
|
|
2013-05-23 12:23:18
TCM G J column, column, column GH 1.2 meters between poured wall pressure beams, wall plaster.
|
|
2013-05-23 12:24:58
TCM J row, G row, the GH row 1.2 meter low wall construction presses the top-beam, the wall surface plastering.
|
|
2013-05-23 12:26:38
TCM j 1.2 m between the columns, column g, GH column capping girder poured with a low wall, wall plastering.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區