|
關注:1
2013-05-23 12:21
求翻譯:設計收費依據為國家發展計劃委員會和建設部頒布的《工程勘察設計收費標準(2002年修訂本)》,以上述各部分工程造價的直接費用作計費額,取難度系數為0.85,專業調整系數送變電項目為1.2。是什么意思?![]() ![]() 設計收費依據為國家發展計劃委員會和建設部頒布的《工程勘察設計收費標準(2002年修訂本)》,以上述各部分工程造價的直接費用作計費額,取難度系數為0.85,專業調整系數送變電項目為1.2。
問題補充: |
|
2013-05-23 12:21:38
Amendment of the design fees in accordance with the State Development Planning Commission and the Ministry of Construction promulgated the "engineering survey and design fees (2002)", the direct costs of the various parts of the project cost for the billing amount, taking the coefficient of difficul
|
|
2013-05-23 12:23:18
Design fees are based on National Development Planning Commission and the Ministry of Construction Engineering, survey, and design standards of charges (2002 revision) of each of the above, the cost of the direct costs for billing, the difficulty factor of 0.85 and professional adjustment factor to
|
|
2013-05-23 12:24:58
The design charge basis for State development planning commission and the ministry of construction promulgation "the Project Reconnaissance Design Charge Standard (in 2002 Revised edition)", served as the cost volume by the above various part of project construction cost flat cost, took the difficul
|
|
2013-05-23 12:26:38
Design fees by the State Development Planning Commission and the Ministry of construction issued by the engineering investigation and design of charge (2002 revised edition), to all of the above part of the direct cost of construction cost for billing amount, and difficulty coefficient of 0.85, prof
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區