求翻譯:樁底溶洞頂板層厚度不滿足要求時必須穿越時,樁基穿過溶洞可采用充填封閉法、鋼護筒施工法等進行處理。是什么意思?![]() ![]() 樁底溶洞頂板層厚度不滿足要求時必須穿越時,樁基穿過溶洞可采用充填封閉法、鋼護筒施工法等進行處理。
問題補充: |
|
2013-05-23 12:21:38
Required to pass through the pile layer thickness does not meet the requirements of the end of the cave roof, pile through the cave can be filled with the closed method, the steel casing construction method for processing.
|
|
2013-05-23 12:23:18
Pile the cave roof layer thickness does not meet requirements, you must cross, pile through the caverns filled with steel cover closed, and Construction Law.
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
Pile end of cave roof layer thickness does not meet the requirements when you must cross, through the cave can be filling sealing method of pile foundation, steel casing construction method for processing.
|
|
2013-05-23 12:28:18
Pile bottom limestone cave roof level thickness does not satisfy when the request when must pass through, the pile foundation traversing limestone cave may use the backfill seal law, the steel protects the tube technology and so on to carry on processing.
|