|
關注:1
2013-05-23 12:21
求翻譯:其中:A是墻后填土主動土壓力系數,B是整個斷面的重心至墻趾的距離,Z是墻后填土主動土壓力作用點位置。是什么意思?![]() ![]() 其中:A是墻后填土主動土壓力系數,B是整個斷面的重心至墻趾的距離,Z是墻后填土主動土壓力作用點位置。
問題補充: |
|
2013-05-23 12:21:38
Where: a backfill the active earth pressure coefficient, b is the distance of the center of gravity of the entire section to the wall toe, z is the position of wall backfill the active earth pressure.
|
|
2013-05-23 12:23:18
Where: A after Wall filling active earth pressure coefficient, B throughout the cross-section is the focus of the distance to a wall, a wall Z after filling active earth pressure role.
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
Where: a is the coefficient of active earth pressure of wall fill, b is the distance between gravity and toe of the wall for the entire section, z is the role of active earth pressure of wall fill point.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區