|
關注:1
2013-05-23 12:21
求翻譯:其中:A是墻后填土主動土壓力xishu,B是整個斷面的重心至墻趾的距離,Z是墻后填土主動土壓力作用點位置。是什么意思?![]() ![]() 其中:A是墻后填土主動土壓力xishu,B是整個斷面的重心至墻趾的距離,Z是墻后填土主動土壓力作用點位置。
問題補充: |
|
2013-05-23 12:21:38
Where: a backfill the active earth pressure, b is the distance of the center of gravity of the entire section to the wall toe, z is the position backfill the active earth pressure.
|
|
2013-05-23 12:23:18
Where: A after Wall filling active earth pressure, and the entire cross-section B is the focus of the distance from the wall, a wall Z after filling active earth pressure role.
|
|
2013-05-23 12:24:58
In which: After A is the wall the earth fill active thrust of earth, B is the entire cross section center of gravity to the wall foot distance, after Z is the wall the earth fill initiative earth-pressure point of force concurrence position.
|
|
2013-05-23 12:26:38
Where: a is the active earth pressure of wall after filling, b is the distance between gravity and toe of the wall for the entire section, z is the role of active earth pressure of wall fill point.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區