|
關(guān)注:1
2013-05-23 12:21
求翻譯:時間間隔越小,路基工后沉降也較大,因而獲得的變形量也較大。是什么意思?![]() ![]() 時間間隔越小,路基工后沉降也較大,因而獲得的變形量也較大。
問題補充: |
|
2013-05-23 12:21:38
The smaller the interval Settlement after large deformation amount received as a result.
|
|
2013-05-23 12:23:18
Time interval, the smaller the roadbed after it has a larger settlement, and the deflection.
|
|
2013-05-23 12:24:58
The time-gap is smaller, after the roadbed labor subsides is also big, thus obtains the amount of deformity is also big.
|
|
2013-05-23 12:26:38
Smaller intervals, post-construction settlement of subgrade is also large, and acquired deformations are large.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)