求翻譯:為了緩解電力供應對集團發展的制約,公司于2004年初決定自建發電廠,以解決電網供電不足的矛盾,并委托四川省電力設計院進行設計。是什么意思?![]() ![]() 為了緩解電力供應對集團發展的制約,公司于2004年初決定自建發電廠,以解決電網供電不足的矛盾,并委托四川省電力設計院進行設計。
問題補充: |
|
2013-05-23 12:21:38
In order to alleviate the constraints of the power supply on the development of the Group, the company decided in early 2004 to a self-built power plant, designed to solve the problem of insufficient power grid, and commissioned by the Sichuan Electric Power Design Institute.
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
In order to alleviate the electric power supply the restriction which develops to the group, the company in at the beginning of 2004 decided from constructs the power plant, resolves the electrical network power supply insufficient contradiction, and entrusts the Sichuan electric power design instit
|
|
2013-05-23 12:26:38
In order to alleviate the electricity supply constraints on the development of the group, in early 2004, the company decided to build power plants in order to solve the contradiction of insufficient power supply, and to entrust the design of Sichuan electric power Design Institute.
|
|