|
關(guān)注:1
2013-05-23 12:21
求翻譯:從Step10取下完成整形的鉸鏈本體,將銷軸及完成整形的鉸鏈本體依次放入Step20定位工裝中是什么意思?![]() ![]() 從Step10取下完成整形的鉸鏈本體,將銷軸及完成整形的鉸鏈本體依次放入Step20定位工裝中
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Remove from step10 the completed plastic hinge body, the pin and completion of the plastic hinge body turn into step20 positioning tooling
|
|
2013-05-23 12:23:18
正在翻譯,請(qǐng)等待...
|
|
2013-05-23 12:24:58
Takes down from Step10 completes the reshaping the hinge main body, will sell the axis and completes the reshaping the hinge main body to put in turn the Step20 localization work clothes
|
|
2013-05-23 12:26:38
Step10 remove the complete plastic hinged body, PIN and complete of plastic hinge in the ontology are put into the Step20 positioning tool
|
|
2013-05-23 12:28:18
正在翻譯,請(qǐng)等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)