|
關(guān)注:1
2013-05-23 12:21
求翻譯:本文進(jìn)行了分區(qū)設(shè)計(jì),并以長春高校土壤源熱泵工程為例,進(jìn)行了具體的設(shè)計(jì)與運(yùn)行模擬研究。是什么意思?![]() ![]() 本文進(jìn)行了分區(qū)設(shè)計(jì),并以長春高校土壤源熱泵工程為例,進(jìn)行了具體的設(shè)計(jì)與運(yùn)行模擬研究。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
Were partitioned design, and the Changchun College of ground source heat pump works as an example, the specific design and run simulation.
|
|
2013-05-23 12:23:18
This article gives a step-by-area design, and in order to Changchun University ground source heat pump works as an example, for a specific design and run a simulation study.
|
|
2013-05-23 12:24:58
This article has carried on the district design, and take Changchun University soil source heat pump project as the example, has carried on the concrete design and the movement simulator study.
|
|
2013-05-23 12:26:38
Partitioned design in this article, and a case study of Changchun University of ground-source heat pumps, design and run simulations of specific studies were carried out.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)