|
關注:1
2013-05-23 12:21
求翻譯:各分項裝飾工程施工前,編制相應的施工技術措施,其內容包括:施工準備、操作工藝、質量標準、成品保護。是什么意思?![]() ![]() 各分項裝飾工程施工前,編制相應的施工技術措施,其內容包括:施工準備、操作工藝、質量標準、成品保護。
問題補充: |
|
2013-05-23 12:21:38
Sub-decoration works construction, the preparation of the construction of technical measures include: the preparation of construction, operation process, quality standards, product protection.
|
|
2013-05-23 12:23:18
Decorated with the sub-project, the preparation of the corresponding construction technology measures, including: construction, operations, quality standards, the finished product.
|
|
2013-05-23 12:24:58
Before various sub-items decoration project construction, establishes the corresponding construction technology measure, its content includes: Construction preparation, operation craft, quality specification, end product protection.
|
|
2013-05-23 12:26:38
Before the construction decoration engineering, construction technology of preparation of corresponding measures, which include: construction preparation, operation, quality standards, product protection.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區