|
關注:1
2013-05-23 12:21
求翻譯:The adjacent road surfaces must remain trafficable, and cracking or cave-ins must be avoided. All shoring and timbering shall be done to the approval of the Project Manager, who may order such shoring or timbering to be strengthened or altered if he considers this necessary in the interests of the work or to safeguard是什么意思?![]() ![]() The adjacent road surfaces must remain trafficable, and cracking or cave-ins must be avoided. All shoring and timbering shall be done to the approval of the Project Manager, who may order such shoring or timbering to be strengthened or altered if he considers this necessary in the interests of the work or to safeguard
問題補充: |
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區