|
關注:1
2013-05-23 12:21
求翻譯:The control building and toilet building shall be built to a design and with materials to the approval of the Project Manager and in accordance with the specifications. The Contractor shall design the buildings taking into account the requirements listed under Scope of Works and allow for space for future extensions, 是什么意思?![]() ![]() The control building and toilet building shall be built to a design and with materials to the approval of the Project Manager and in accordance with the specifications. The Contractor shall design the buildings taking into account the requirements listed under Scope of Works and allow for space for future extensions,
問題補充: |
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區