關注:1
2013-05-23 12:21
求翻譯:為降低壩體浸潤線及孔隙壓力,增加壩體穩(wěn)定,下游壩腳部位增設堆石排水棱體。是什么意思?![]() ![]() 為降低壩體浸潤線及孔隙壓力,增加壩體穩(wěn)定,下游壩腳部位增設堆石排水棱體。
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
As well as to reduce the saturation line and pore pressure, and increased stability, and downstream as well as additional stack stone foot Site drainage edge.
|
|
2013-05-23 12:24:58
In order to reduce the dam line of saturation and the pore pressure, the increase dam is stable, the downstream toe of dam spot additionally builds piles up stones the draining water bank or ridge between fields body.
|
|
2013-05-23 12:26:38
To reduce dam saturation line and pore pressure, increasing the stability of the dam, downstream of dam toe parts of additional rock drainage prisms.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|