求翻譯:本次除險加固設計對下游壩面增設護坡設施。其背水側設反濾層,其中碎石層厚0.15m、細砂層厚0.15m。背水坡全部植草皮防護,以防止雨水漫流造成坡面沖刷。是什么意思?![]() ![]() 本次除險加固設計對下游壩面增設護坡設施。其背水側設反濾層,其中碎石層厚0.15m、細砂層厚0.15m。背水坡全部植草皮防護,以防止雨水漫流造成坡面沖刷。
問題補充: |
|
2013-05-23 12:21:38
The reinforcement design of the downstream dam face additional slope protection facilities. Back water side set up a filter layer, the gravel thickness of 0.15m, fine sand thickness of 0.15m. Downstream slope all planting turf cause slope erosion protection, to prevent rain overflow.
|
|
2013-05-23 12:23:18
This reinforce the design of the downstream as well as additional berm. Its back-to-the-water side of the filter, gravel layer thickness 0.15 m thick, fine sand 0.15 m. Slope-back-to-the-water turf protection, all in order to prevent storm water overflow caused by scouring the slope.
|
|
2013-05-23 12:24:58
正在翻譯,請等待...
|
|
2013-05-23 12:26:38
The design of danger-removing and reinforcement on downstream dam surface of slope protection with additional facilities. Its back side of water filter, which crushed 0.15m, thick sand layer thickness 0.15m. All planting grass on the back water slope protection to prevent storm water overflow cause
|
|