|
關注:1
2013-05-23 12:21
求翻譯:長期規劃:在Batsari大壩下游選址建設新壩,提高水庫蓄水量,增強水庫在防洪、灌溉和供水方面的作用。是什么意思?![]() ![]() 長期規劃:在Batsari大壩下游選址建設新壩,提高水庫蓄水量,增強水庫在防洪、灌溉和供水方面的作用。
問題補充: |
|
2013-05-23 12:21:38
Long-term planning: building a new dam downstream from the dam site in batsari reservoir storage capacity, and enhance the role of reservoirs in flood control, irrigation and water supply.
|
|
2013-05-23 12:23:18
Long-term planning: In Batsari dam downstream sites and construction of the new, improved reservoirs to increase the reservoir flood control, irrigation and water supply.
|
|
2013-05-23 12:24:58
Long-term plan: Constructs the new dam in the Batsari dam downstream selected location, enhances the reservoir water-holding capacity, strengthens the reservoir in the flood prevention, the irrigation and the water supply aspect function.
|
|
2013-05-23 12:26:38
Long-term planning: Batsari downstream of the dam site selection of new dam-building, improve reservoir storage capacity, enhanced role of reservoir in flood control, irrigation and water supply.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區