|
關注:1
2013-05-23 12:21
求翻譯:受當時施工技術條件的限制,大壩采用人工填筑建成,大壩填筑質量達不到規范要求;是什么意思?![]() ![]() 受當時施工技術條件的限制,大壩采用人工填筑建成,大壩填筑質量達不到規范要求;
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
The construction technology at that time, the limits of the terms in dam artificial landfill reclamation Dam was built, and not up to quality standards;
|
|
2013-05-23 12:24:58
At that time constructs the engineering factor limit, the dam uses the artificial reclamation to complete, the dam reclamation quality cannot meet the standard requirements;
|
|
2013-05-23 12:26:38
Limited by the construction specifications and manual filling of the dam is completed, dam filling quality does not meet the specifications;
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區