|
關(guān)注:1
2013-05-23 12:21
求翻譯:對鐵路工程建設(shè)提出了更高的要求,同時也給鐵路工程的設(shè)計,施工帶來了更高的挑戰(zhàn)是什么意思?![]() ![]() 對鐵路工程建設(shè)提出了更高的要求,同時也給鐵路工程的設(shè)計,施工帶來了更高的挑戰(zhàn)
問題補充: |
|
2013-05-23 12:21:38
Railway construction projects put forward higher requirements, but also a greater challenge to the railway engineering design, construction
|
|
2013-05-23 12:23:18
The railway construction of the project have put greater demands, but also to the railways of the engineering design and construction have resulted in more high-challenge
|
|
2013-05-23 12:24:58
Proposed to the railroad engineering construction a higher request, simultaneously also gave the railroad project the design, the construction has brought a higher challenge
|
|
2013-05-23 12:26:38
正在翻譯,請等待...
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)