|
關注:1
2013-05-23 12:21
求翻譯:設備或機器的臨時通電需要測試、調整或設置機器時可能要通電,如果在測試,調整或設置后不需要再通電的,設備應再鎖定和標記。是什么意思?![]() ![]() 設備或機器的臨時通電需要測試、調整或設置機器時可能要通電,如果在測試,調整或設置后不需要再通電的,設備應再鎖定和標記。
問題補充: |
|
2013-05-23 12:21:38
Temporary power equipment or machinery need to be tested, adjusted or set up your machine may be energized, if the testing, tuning or settings do not need electricity, the equipment should be locked and marked.
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
Possibly the equipment or the machine temporary circular telegram needs to test, the adjustment or establishes when the machine must electrify, if is testing, after the adjustment or the establishment does not need again to electrify, the equipment should again lock and the mark.
|
|
2013-05-23 12:26:38
Temporary power needs of the equipment or machine testing, adjusting, or set the machine it is possible to power up, if in testing, adjustment or settings do not need to power up, the device should be locked and tagged.
|
|
2013-05-23 12:28:18
Interim power needs testing, adjusting of equipment or machines or might set the camera power, if testing, adjust or set no more power after, device lock and tag.
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區