|
關注:1
2013-05-23 12:21
求翻譯:我司承建之蘇州工業(yè)園區(qū)唯亭鎮(zhèn)春輝路16號『萬福船舶機械(蘇州)有限公司廠房二期工程』目前已屆收尾,有關收尾諸事前已于2012.05.08致函 貴司(詳如“萬福(12)蘇建函字第0508001號”文),然 貴司遲遲未予書面回覆協(xié)調(diào),望 貴司能正視并積極落實處理。是什么意思?![]() ![]() 我司承建之蘇州工業(yè)園區(qū)唯亭鎮(zhèn)春輝路16號『萬福船舶機械(蘇州)有限公司廠房二期工程』目前已屆收尾,有關收尾諸事前已于2012.05.08致函 貴司(詳如“萬福(12)蘇建函字第0508001號”文),然 貴司遲遲未予書面回覆協(xié)調(diào),望 貴司能正視并積極落實處理。
問題補充: |
|
2013-05-23 12:21:38
Weiting Town, Chunhui Road, on the 16th, I am the Secretary for the construction of the Suzhou Industrial Park, "Hail, Marine Machinery (Suzhou) Co., Ltd. plant two works" The current session ending about finishing everything go before 2012.05.08 letter to your company (as shown Su Jian, "Hail, (12)
|
|
2013-05-23 12:23:18
I am secretary of the Suzhou Industrial Park contractors Gardon spring '16 no longer 10,000 well ship machinery (Suzhou) Co. , Ltd. " plant 2 phase of the project is now down to its end, the finish to advance to 012.05 .08 wrote to the Secretary (for details such as the 10,000 well (12) Su-letter wo
|
|
2013-05-23 12:24:58
I take charge of Suzhou of industry garden area only pavilion town the construction spring the splendor road 16 'innumerable blessings ships machinery (Suzhou) limited company workshop second phased project' at present already a session of conclusion, in front of related conclusion all things in 201
|
|
2013-05-23 12:26:38
Our contractors of Suzhou Industrial Park only Pavilion town spring Fai Road 16th, "wanfu ship machinery (Suzhou) limited Workshop II period engineering" currently has session ending, about ending all prior has Yu 2012.05.08 wrote to your Division (details as "wanfu (12) Su Jian letter word No. 0508
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)