|
關注:1
2013-05-23 12:21
求翻譯:安裝后段軌道的兩個電纜線槽,根據現場要求利用工具給線槽開孔、攻絲、定位。是什么意思?![]() ![]() 安裝后段軌道的兩個電纜線槽,根據現場要求利用工具給線槽開孔、攻絲、定位。
問題補充: |
|
2013-05-23 12:21:38
Two cable tray installation of rear section of track, according to site requirements to use the tool to the trough opening, tapping, location.
|
|
2013-05-23 12:23:18
After the installation of the orbit of two cable slot, based on an on-site for online slot using the tool to the hole, tapping, and positioning.
|
|
2013-05-23 12:24:58
After the installment the section track two electric cable trunking, opens the hole according to the scene request using the tool to the trunking, attacks the silk, the localization.
|
|
2013-05-23 12:26:38
After installation two cable slot track, according to the site requires the use of tools to trunking hole, tapping, position.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區