求翻譯:在結構設計中,根據地質條件和碼頭功能先初步確定沉箱的外形尺寸和沉箱內填石高度,然后進行作用分析,按永久作用、可變作用、偶然作用列出碼頭荷載的標準值,在此基礎上進行穩定性驗算,根據驗算結果對沉箱外形尺寸和沉箱內填石高度進行修改,并對沉箱前面板和底板進行了配筋計算和抗裂驗算。是什么意思?![]() ![]() 在結構設計中,根據地質條件和碼頭功能先初步確定沉箱的外形尺寸和沉箱內填石高度,然后進行作用分析,按永久作用、可變作用、偶然作用列出碼頭荷載的標準值,在此基礎上進行穩定性驗算,根據驗算結果對沉箱外形尺寸和沉箱內填石高度進行修改,并對沉箱前面板和底板進行了配筋計算和抗裂驗算。
問題補充: |
|
2013-05-23 12:21:38
First preliminary structural design, according to the geological conditions and terminal capabilities determine the caisson Dimensions and caisson rock fill height, then the role of analysis, permanent role, variable role, the occasional role of listed pier load standard value, in this on the basis
|
|
2013-05-23 12:23:18
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
In structure design in the, under geological conditions and terminal function first preliminary determines caisson of shape size and caisson within filled stone height, and for role analysis, by permanent role, and variable role, and accidentally role lists Terminal load contains of standard value,
|
|
2013-05-23 12:28:18
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區