|
關注:1
2013-05-23 12:21
求翻譯:此設計針對大流量低出口全壓的工況進行分析,選取,計算,核算,繪圖等,是較完整的通風機設計過程。是什么意思?![]() ![]() 此設計針對大流量低出口全壓的工況進行分析,選取,計算,核算,繪圖等,是較完整的通風機設計過程。
問題補充: |
|
2013-05-23 12:21:38
This design is analyzed for total pressure of the large flow of low export conditions, select, calculate, accounting, graphics, etc., is a more complete fan design process.
|
|
2013-05-23 12:23:18
The design is optimized for maximum flow of Full Voltage Low export performance analysis, selection, computing, accounting, drawings, and more, is a more complete ventilation design process.
|
|
2013-05-23 12:24:58
This design exports the entire pressure in view of the great current capacity the operating mode to carry on the analysis lowly, the selection, the computation, the calculation, the cartography and so on, is the complete ventilator design process.
|
|
2013-05-23 12:26:38
Designed for high flow and low export full-pressure condition analysis, selection, computing, accounting, drawing and so on, is a complete fan of the design process.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區