|
關注:1
2013-05-23 12:21
求翻譯:擬采取張拉環(huán)向索的施工方案,根據(jù)文獻[2]提出的the elliptic suspended dome structure的預應力確定方法,經(jīng)優(yōu)化分析,由內(nèi)向外各圈環(huán)向索初始預拉力分別為是什么意思?![]() ![]() 擬采取張拉環(huán)向索的施工方案,根據(jù)文獻[2]提出的the elliptic suspended dome structure的預應力確定方法,經(jīng)優(yōu)化分析,由內(nèi)向外各圈環(huán)向索初始預拉力分別為
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
正在翻譯,請等待...
|
|
2013-05-23 12:24:58
Plans to adopt Zhang Lahuan to the rope construction plan, proposes the the elliptic suspended dome structure pre-stressed determination method according to literature (2), after the optimized analysis, from inside to outside various loops to the rope initial pretension strength respectively is
|
|
2013-05-23 12:26:38
Construction scheme of cable tension ring to be taken to, according to [2] of the elliptic suspended dome structure made by prestressed method, analysis of optimized, from the inside out the rings to the respective initial pretension cable
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權舉報專區(qū)