|
關注:1
2013-05-23 12:21
求翻譯:All the shop drawings and as built drawing shall be prepared by the Sub-Contractor and submitted to the Employer for final approval once the Engineer has given approval.是什么意思?![]() ![]() All the shop drawings and as built drawing shall be prepared by the Sub-Contractor and submitted to the Employer for final approval once the Engineer has given approval.
問題補充: |
|
2013-05-23 12:21:38
所有的店鋪圖紙和圖紙建造的,應當由分包商準備和提交最終批準的雇主,一旦工程師已批準。
|
|
2013-05-23 12:23:18
所有車間圖紙和竣工圖應編制并提交給雇主的兩方為─最后批準的工程師一旦獲得批準。
|
|
2013-05-23 12:24:58
所有商店圖畫,并且,因為被修造的圖畫將由轉承包商準備并且一次遞交給雇主為最終核準工程師給了認同。
|
|
2013-05-23 12:26:38
店里的所有繪圖和建筑的繪圖須備次承判商和工程師已批準后提交給雇主的最后批準。
|
|
2013-05-23 12:28:18
所有商店素描和當被建造素描將被分銷商準備和為最后審批提交給雇主一旦工程師給了審批。
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區