|
關注:1
2013-05-23 12:21
求翻譯:設計能力、提速方案、提速效果等方面,對既有線的平縱斷面改建、增建二線的平面、縱斷面以及橫斷面進行了設計。是什么意思?![]() ![]() 設計能力、提速方案、提速效果等方面,對既有線的平縱斷面改建、增建二線的平面、縱斷面以及橫斷面進行了設計。
問題補充: |
|
2013-05-23 12:21:38
Design capabilities, speed program, speed effects, cross and vertical sections of the existing lines, alterations, additions of second-line plane, longitudinal and cross-sectional design.
|
|
2013-05-23 12:23:18
Design capacity, speed, and speed programs, both on the flat 縱斷面 alterations, additions, and 2-Wire flat and 縱斷面 transverse to the design.
|
|
2013-05-23 12:24:58
Designed capacity, puts forward the fast plan, raises aspects and so on fast effect, to already the wired even longitudinal section reconstruction, additionally constructed two planes, the longitudinal section as well as the cross section has carried on the design.
|
|
2013-05-23 12:26:38
Aspects of programme design capabilities, speed, speed-increasing effect, profile alteration to the existing line, the second line of planes, longitudinal section and cross design.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區