|
關(guān)注:1
2013-05-23 12:21
求翻譯:6.7 上述系統(tǒng)調(diào)試完畢,全套設(shè)備出水合格后,投入運(yùn)行,以上運(yùn)行時(shí)出水水質(zhì)超標(biāo),應(yīng)立刻停止運(yùn)行并轉(zhuǎn)入清洗、恢復(fù),超濾裝置和反滲透裝置的清洗步驟參見(jiàn)設(shè)備廠家控制說(shuō)明。是什么意思?![]() ![]() 6.7 上述系統(tǒng)調(diào)試完畢,全套設(shè)備出水合格后,投入運(yùn)行,以上運(yùn)行時(shí)出水水質(zhì)超標(biāo),應(yīng)立刻停止運(yùn)行并轉(zhuǎn)入清洗、恢復(fù),超濾裝置和反滲透裝置的清洗步驟參見(jiàn)設(shè)備廠家控制說(shuō)明。
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
6.7 The above system commissioning is completed, the water after passing of a full set of equipment put into operation, more than run excessive water quality, should stop running immediately and transferred to the cleaning, restoration, cleaning steps to see the equipment manufacturers, the ultrafil
|
|
2013-05-23 12:23:18
6.6 from activated carbon filters to pumps, including the film behind the water pump system to start and stop conditions before and after the tank is usually the level decisions.
|
|
2013-05-23 12:24:58
6.7 above system debuggings finished, after complete set of equipment water leakage qualified, the investment moves, the above moves when water leakage water quality exceeding the allowed figure, should stop moving and changing over to the clean, the restoration immediately, ultra filters installmen
|
|
2013-05-23 12:26:38
6.7 this system debugging is complete, complete set of equipment for water after passing, running, running above water when exceeded, should be immediately stopped and transferred to the cleaning, restoration, ultrafiltration devices and cleaning steps of reverse osmosis devices See device manufactu
|
|
2013-05-23 12:28:18
NO.debug steps;
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專(zhuān)區(qū) | 電信詐騙舉報(bào)專(zhuān)區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專(zhuān)區(qū) | 涉企侵權(quán)舉報(bào)專(zhuān)區(qū)