|
關(guān)注:1
2013-05-23 12:21
求翻譯:為達到校園網(wǎng)的設(shè)計要求,對各層的交換機及路由器都進行了詳細的配置,并采用一些技術(shù)解決了校園網(wǎng)所面臨的問題。是什么意思?![]() ![]() 為達到校園網(wǎng)的設(shè)計要求,對各層的交換機及路由器都進行了詳細的配置,并采用一些技術(shù)解決了校園網(wǎng)所面臨的問題。
問題補充: |
|
2013-05-23 12:21:38
Requirements for the design of the campus network, layers of switches and routers have carried out a detailed configuration, and using technology to solve the problems faced by the campus network.
|
|
2013-05-23 12:23:18
In order to attain the design request of the campus net, all carried on to the commutation machine and routers of each layer to detailedly install, and adopt some techniques resolved the campus net face of problem.
|
|
2013-05-23 12:24:58
In order to achieve the campus net the design request, has all carried on the detailed disposition to each level switchboard and the router, and used some technologies to solve the problem which the campus net faced.
|
|
2013-05-23 12:26:38
To reach the campus network design requirements, on the configuration of switches and routers are in detail, and use technology to solve the problems facing the campus network.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)