|
關注:1
2013-05-23 12:21
求翻譯:冷熱負荷計算采用冷負荷系數法;送風狀態點及新風量按相關標準確定;送風形式是上送下回,送風口為方形散流器,用假定流速法對風管進行了設計及水力計算;冷熱源設計在商場的地下負一層,選擇離心式機組,再選用冷卻塔及空調機組輔助設備,并對冷卻水系統水泵選擇作了估算;對風道減震作了簡要的說明。是什么意思?![]() ![]() 冷熱負荷計算采用冷負荷系數法;送風狀態點及新風量按相關標準確定;送風形式是上送下回,送風口為方形散流器,用假定流速法對風管進行了設計及水力計算;冷熱源設計在商場的地下負一層,選擇離心式機組,再選用冷卻塔及空調機組輔助設備,并對冷卻水系統水泵選擇作了估算;對風道減震作了簡要的說明。
問題補充: |
|
2013-05-23 12:21:38
Cooling and heating load calculated using the method of cooling load factor; air state point and fresh air is determined in accordance with relevant standards; air form is sent on the next time, the outlet diffuser for the square duct design assume that the flow rate and hydraulic calculation; cold
|
|
2013-05-23 12:23:18
Hot cold loads calculated using cold load factor law; air condition and the new air; by pressing the relevant criteria to determine the form of an air leak, the air inlet square heat flow, assuming that the flow of air-duct design and hydraulic calculations; cold heat design in the mall with the und
|
|
2013-05-23 12:24:58
The cold heat load computation uses the cold load method of correlates; Blast condition and new amount of wind according to related standard determination; The blast form will be on delivers the next time, the supply-air outlet drifts for the square shape, has carried on the design and the water pow
|
|
2013-05-23 12:26:38
Hot and cold load calculation used cold load coefficient method; sent wind State points and the fresh air volume by related standard determines; sent wind form is Shang sent next time, sent outlet for square bulk flow device, with assumes that velocity method on wind tube for has design and the hydr
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區