|
關注:1
2013-05-23 12:21
求翻譯:施工部署,施工進度計劃,施工準備與資源配置計劃,主要施工方案,施工現場平面布置,結合本工程特點的針對性措施,季節性施工措施,質量保證措施,質量通病防治,安全生產和文明施工措施,附錄,謝辭是什么意思?![]() ![]() 施工部署,施工進度計劃,施工準備與資源配置計劃,主要施工方案,施工現場平面布置,結合本工程特點的針對性措施,季節性施工措施,質量保證措施,質量通病防治,安全生產和文明施工措施,附錄,謝辭
問題補充: |
|
2013-05-23 12:21:38
Deployment of construction, construction schedule, construction preparation and resource allocation plans, major construction programs, construction site layout, combined with the engineering characteristics of the targeted measures, seasonal construction measures, quality assurance measures, qualit
|
|
2013-05-23 12:23:18
Construction, construction progress, the construction plans for plan and the resource configuration, the main construction programs, construction site plan and the engineering characteristics of specific measures, seasonal work, quality assurance measures, quality control, production and worldwide r
|
|
2013-05-23 12:24:58
The construction deployed that, the construction progress plan, the construction preparation and the resources disposition plan, mainly constructs the plan, the job location plane arrangement, unifies this project characteristic the pointed measure, the seasonal construction measure, the quality ass
|
|
2013-05-23 12:26:38
Deployment of construction, construction schedules, construction preparation and resource allocation plan, major construction programme, the construction site layout, combined with the characteristics of specific measures, seasonal construction measures, quality assurance, quality problems, and civi
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區