求翻譯:本設計中貯礦槽設置為單排,采用皮帶機供料,貯礦槽寬度為10。高度為12 m。礦槽總長度決定于車間的長度,后者決定于高爐中心線的距離。單個礦槽長度(采用帶式運輸機)為5。是什么意思?![]() ![]() 本設計中貯礦槽設置為單排,采用皮帶機供料,貯礦槽寬度為10。高度為12 m。礦槽總長度決定于車間的長度,后者決定于高爐中心線的距離。單個礦槽長度(采用帶式運輸機)為5。
問題補充: |
|
2013-05-23 12:21:38
The design of storage Trough is set to single row, the use of belt conveyor feeding, storage Trough width of 10. Height of 12 m. The total length of the mine shafts is determined by the length of the workshop, the latter is determined by the distance of the blast furnace centerline. Length of a sing
|
|
2013-05-23 12:23:18
In this design the mine set up as a single slot, and a belt-feed slot width, the mine is 10. Height is 12 m. Mine slot decided to total length of the workshop on length, the latter from center of furnace. A single mine slot length (with band-style cargo planes) is 5.
|
|
2013-05-23 12:24:58
In this design the bunker establishes as the single line, uses the belt fastener to supply the material, the bunker width is 10.Is highly 12 m.The ore trough total length decided in the workshop length, the latter decides in the blast furnace middle line distance.The single ore trough length (uses b
|
|
2013-05-23 12:26:38
Storage bin set this design as a single-row, with belt feeding, storage bin width is 10. Height of 12 m. Bin total length depends on the length of the workshop, which determines the distance to center line of blast furnace. A single bin length (belt-type conveyor) 5.
|
|