求翻譯:2. 貯礦槽結(jié)構(gòu):采用鋼筋混凝土結(jié)構(gòu),礦槽周壁和底壁都用鋼筋混凝土澆灌而成。為了保證貯礦槽內(nèi)表面不被磨損,要在槽內(nèi)加襯板,槽底板與水平面夾角50°~55°。是什么意思?![]() ![]() 2. 貯礦槽結(jié)構(gòu):采用鋼筋混凝土結(jié)構(gòu),礦槽周壁和底壁都用鋼筋混凝土澆灌而成。為了保證貯礦槽內(nèi)表面不被磨損,要在槽內(nèi)加襯板,槽底板與水平面夾角50°~55°。
問題補(bǔ)充: |
|
2013-05-23 12:21:38
2 storage Trough structure: reinforced concrete structures, mine shafts, the peripheral wall and bottom wall, reinforced concrete has been poured from. In order to ensure the storage ore tank surface is not worn to increase in the slot liner, slot backplane and the horizontal angle of 50 ° to 55 °.
|
|
2013-05-23 12:23:18
2.The mine slot structure: a reinforced concrete structure, mine slot Week wall and floor with reinforced concrete walls are poured out. In order to ensure that air mine slot inside surface will not be worn in the slot to the bottom of the tank, and backing plate and angle between horizontal plane 5
|
|
2013-05-23 12:24:58
正在翻譯,請(qǐng)等待...
|
|
2013-05-23 12:26:38
2. the storage bin structure: reinforced concrete structure, bin walls and walls with reinforced concrete water at the end of the week. In order to ensure that surface in the storage bin is not being worn, plus liner in the slot, slot backplane with the horizontal angle of 50 ° ~55 °.
|
|
2013-05-23 12:28:18
2. Bunker structure: Uses the reinforced concrete structure, ore trough Zhou Bi and the bottom panel all uses the reinforced concrete irrigation to become.In order to guarantee the bunker internal surface does not wear, must add the backing in the trough, the trough ledger wall and the horizontal pl
|