|
關(guān)注:1
2013-05-23 12:21
求翻譯:本基坑工程支護設(shè)計根據(jù)工程實際情況分為兩個支護部分是什么意思?![]() ![]() 本基坑工程支護設(shè)計根據(jù)工程實際情況分為兩個支護部分
問題補充: |
|
2013-05-23 12:21:38
The foundation pit support design in accordance with the actual situation of the project divided into two supporting parts
|
|
2013-05-23 12:23:18
The pit design engineering support based on the engineering practice is divided into two parts the support
|
|
2013-05-23 12:24:58
This hole excavated for building foundation project supports and protections design divides into two supports and protections parts according to the project actual situation
|
|
2013-05-23 12:26:38
The Foundation pit support design according to the actual situation is divided into two support components
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報平臺 | 網(wǎng)上有害信息舉報專區(qū) | 電信詐騙舉報專區(qū) | 涉歷史虛無主義有害信息舉報專區(qū) | 涉企侵權(quán)舉報專區(qū)