|
關注:1
2013-05-23 12:21
求翻譯:深基坑工程涉及結構工程、巖土工程和環境工程等眾多學科領域,綜合性高,影響因素多,設計計算理論還不成熟,在一定程度上還依賴于工程實踐經驗。是什么意思?![]() ![]() 深基坑工程涉及結構工程、巖土工程和環境工程等眾多學科領域,綜合性高,影響因素多,設計計算理論還不成熟,在一定程度上還依賴于工程實踐經驗。
問題補充: |
|
2013-05-23 12:21:38
Deep excavation works involve many disciplines of structural engineering, geotechnical engineering and environmental engineering, integrated high-influencing factors, the theory is not yet ripe for design calculations, to a certain extent also depends on engineering practice.
|
|
2013-05-23 12:23:18
deep pit involves structural engineering, geotechnical engineering and environmental engineering, and many other areas of study, with a comprehensive, high-impact factors, design theory of computing, it is not yet at a certain extent, it depends on engineering practice and experience.
|
|
2013-05-23 12:24:58
The deep hole excavated for building foundation project involves the structural engineering, the ground project and the environment project and so on the multitudinous discipline domain, the comprehensive nature is high, affects the factor to be many, the design calculation theory is not mature, als
|
|
2013-05-23 12:26:38
Deep Foundation pit engineering related to structural engineering, geotechnical engineering, environmental engineering and many other fields, comprehensive high, affecting factors and design theory is not yet mature, to a certain extent dependent on engineering practice experience.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區