|
關注:1
2013-05-23 12:21
求翻譯:接入點對側變電站主接線圖,最大負荷、平均負荷、最小負荷及出現季節月份,主變壓器型號、參數,斷路器參數;距離本項目直線距離是什么意思?![]() ![]() 接入點對側變電站主接線圖,最大負荷、平均負荷、最小負荷及出現季節月份,主變壓器型號、參數,斷路器參數;距離本項目直線距離
問題補充: |
|
2013-05-23 12:21:38
正在翻譯,請等待...
|
|
2013-05-23 12:23:18
An access point to the opposite side substation primary wiring diagram, the maximum load, load average, the minimum load and in the season, the main transformer model, parameters, and the circuit breaker parameter; the distance is straight line distance from the project
|
|
2013-05-23 12:24:58
The junction point opposite side transformer substation host wiring diagram, the biggest load, the mean load, slightly shoulder and appear the season month, the main transformer model, the parameter, the circuit breaker parameter; From this project straight distance
|
|
2013-05-23 12:26:38
Access points on the side of substation diagrams, maximum load, load average, minimum loads and appears on the season months, main transformer model, parameters, parameters of circuit breakers; distance projects a straight line distance
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區