|
關注:1
2013-05-23 12:21
求翻譯:根據溶洞平面布置情況設3段承臺,每段承臺間設2cm變形縫,承臺厚度為2m。是什么意思?![]() ![]() 根據溶洞平面布置情況設3段承臺,每段承臺間設2cm變形縫,承臺厚度為2m。
問題補充: |
|
2013-05-23 12:21:38
According to the cave layout of paragraph 3 of the cap, each of 2cm deformation joints between pile cap, pile cap thickness of 2m.
|
|
2013-05-23 12:23:18
The cave floor, with 3 of the table, each one with the 2 CM deformed joints, the single thickness of 2 m.
|
|
2013-05-23 12:24:58
Supposes 3 sections according to the limestone cave plane arrangement situation to receive Taiwan, each section receives interstation supposes the 2cm distortion seam, receives the Taiwan thickness is 2m.
|
|
2013-05-23 12:26:38
Depending on the cave floor set 3 Cap, outlying 2cm deformation joint of each CAP, Cap thickness of 2m.
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區