|
關注:1
2013-05-23 12:21
求翻譯:評審第一輪總布置方案:人機工程、動力總成、布置可行性、法規項、開啟件的主要參數等是什么意思?![]() ![]() 評審第一輪總布置方案:人機工程、動力總成、布置可行性、法規項、開啟件的主要參數等
問題補充: |
|
2013-05-23 12:21:38
The first round of the general layout of the program review: ergonomics, powertrain, layout feasibility, regulatory items, such as on parts of the main parameters
|
|
2013-05-23 12:23:18
The first round jury general arrangement program: man-machine engineering, powertrain, furnished feasibility, regulations and open up parts such as the main parameters
|
|
2013-05-23 12:24:58
Appraises the first turn total scheme of arrangement: Man-machine project, power unit, arrangement feasibility, laws and regulations item of, opening main parameter and so on
|
|
2013-05-23 12:26:38
Review the General layout of the first round of programmes: man-machine engineering, Powertrain, feasibility, regulation, opening the main layout parameters, and so on
|
|
2013-05-23 12:28:18
Evaluate first layout options: ergonomics, Powertrain, laying out feasibility, regulatory, switch on main parameters
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區