|
關注:1
2013-05-23 12:21
求翻譯:1. 所有鋼結構構件均需刷油漆,油漆施工前需對構件作除銹處理,除銹后應立即刷防腐漆(詳見結構設計說明)是什么意思?![]() ![]() 1. 所有鋼結構構件均需刷油漆,油漆施工前需對構件作除銹處理,除銹后應立即刷防腐漆(詳見結構設計說明)
問題補充: |
|
2013-05-23 12:21:38
All steel components are required to brush paint Before painting the required components for rust treatment, rust immediately after anti-corrosion paint brush (see the structural design instructions)
|
|
2013-05-23 12:23:18
1.All steel structural members are required to paint brush, the paint before the construction of the building blocks needed for rust, rust, corrosion resistant paint brush should be immediately (see Structure design description)
|
|
2013-05-23 12:24:58
1. All steel structure component must brush the paint, before the paint construction must do to the component except rust processing, should brush the anti-corrosive varnish after the rust (to for details see structural design explanation) immediately
|
|
2013-05-23 12:26:38
1. all steel components need to paint, paint before the construction components needed to be dealt with rust, rust immediately after brushing anticorrosion coating (please refer to the description of structure design)
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區