|
關注:1
2013-05-23 12:21
求翻譯:分別統計施工設備,利用需要系數法進行負荷計算,選擇變壓器和導線截面,合理設計三級配電與兩級保護的設備,落實用電安全的技術與管理措施,同時作出臨時用電的施工圖與系統圖。是什么意思?![]() ![]() 分別統計施工設備,利用需要系數法進行負荷計算,選擇變壓器和導線截面,合理設計三級配電與兩級保護的設備,落實用電安全的技術與管理措施,同時作出臨時用電的施工圖與系統圖。
問題補充: |
|
2013-05-23 12:21:38
, Respectively, the statistics of construction equipment, need coefficient method for load calculation, select the transformer and wire cross-section, the rational design of the three distribution with two protection devices, the implementation of electrical safety technology and management measures
|
|
2013-05-23 12:23:18
Statistics, respectively, and construction equipment to be used for load calculations factor Law, select transformers and wire cross-section, reasonable design level 3 distribution and two levels of protection of the device, the power of the technology and security measures, as well as managing the
|
|
2013-05-23 12:24:58
Counts the construction equipment separately, the use needs the method of correlates to carry on the load computation, chooses the transformer and the wire section, designs three levels of power distributions reasonably with two level of protection equipment, the realization uses electricity the saf
|
|
2013-05-23 12:26:38
Statistics of construction equipment, respectively, need coefficient method for load calculations, selection and conductor cross section of transformer, reasonable design of three-level power distribution with two-level protection equipment, implementation of safety technology and management measure
|
|
2013-05-23 12:28:18
正在翻譯,請等待...
|
湖北省互聯網違法和不良信息舉報平臺 | 網上有害信息舉報專區 | 電信詐騙舉報專區 | 涉歷史虛無主義有害信息舉報專區 | 涉企侵權舉報專區