|
關(guān)注:1
2013-05-23 12:21
求翻譯:對(duì)配電設(shè)備安裝項(xiàng)目承包商(啟東電力)進(jìn)行最后一次技術(shù)澄清,并完成其員工的入廠培訓(xùn)和考試。是什么意思?![]() ![]() 對(duì)配電設(shè)備安裝項(xiàng)目承包商(啟東電力)進(jìn)行最后一次技術(shù)澄清,并完成其員工的入廠培訓(xùn)和考試。
問(wèn)題補(bǔ)充: |
|
2013-05-23 12:21:38
Distribution equipment installation project contractor (Qidong electricity), a technical clarification, and completed the training and examination of its employees into the plant.
|
|
2013-05-23 12:23:18
The electrical distribution equipment installation contractor of the project (electricity) departed for a final technical clarification, and the completion of its employees into the factory training and examinations.
|
|
2013-05-23 12:24:58
Installs the project contractor east to the switching equipment (to open electric power) to carry on the last technology to clarify, and completes its staff to enter factory training and the test.
|
|
2013-05-23 12:26:38
Power distribution equipment installation project contractors (Qidong power) technical clarification for the last time, and complete factory training and examination of its employees.
|
|
2013-05-23 12:28:18
正在翻譯,請(qǐng)等待...
|
湖北省互聯(lián)網(wǎng)違法和不良信息舉報(bào)平臺(tái) | 網(wǎng)上有害信息舉報(bào)專區(qū) | 電信詐騙舉報(bào)專區(qū) | 涉歷史虛無(wú)主義有害信息舉報(bào)專區(qū) | 涉企侵權(quán)舉報(bào)專區(qū)